PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Caulking stone panels at the North Elevation.jpg Laying out block at at the top of the detention cells Facing North.jpg Laying out block at top of detention cells Facing North.jpg Installed duct work fitings at the 4th floor Facing North.jpg Installed temporary lighting at the 2nd floor Facing East.jpg Installing duct work fitings at the 4th floor Facing West.jpg Laying out block at the 1st floor bathrooms 133-136 Facing North.jpg Started insulating the duct work at the 2nd floor.jpg
Previous pageNext page Installed duct work fitings at the 4th floor Facing North
Installed duct work fitings at the 4th floor Facing North